Design Reviews & Root Cause Analysis
- Initial analysis to identify probable cause (design/construction)
- Executive Designs Review
- As-Built Documentation Review
- Construction Quality Documentation review
- Test Results Analysis
- Non-Conformance and Defects Review
- Asset Management reporting review
- Maintenance Program Review
Forte Value: Our process combines detailed desk study and on-site review to ensure accuracy and completeness of the assessment.
Condition Assessments
- Site Inspections
- Civil and Structural Specialist Inspections
- Electrical Specialist Inspections
- Mechanical Specialist Inspections
- Design Review
- As-Built Documentation Review
- Non-Conformance Review
- Test Results Analysis
- Maintenance Program Review
- Design life impact assessment
- Repair and Maintenance Consultancy (Method + Cost)
Forte Value: Our process combines detailed desk study and on-site review to ensure accuracy and completeness of the assessment.
Track Record
Wind Farm Name | Client's Name | MW | WTGs | OEM | WF Phase | Service Type | Country | Continent | SC Year | COD Year |
---|---|---|---|---|---|---|---|---|---|---|
Spui | Eurus Energy | 20 | 5 | Vestas | D | OE | NL | EUROPE | 2021 | 2019 |
Case Studies
Ventelys WFs (DES-A) - France
Location | Various locations, France |
Developer | Ventelys |
WTG Details | V126, V150, SG114, SG170 |
Capacity / COD | 234 MW, 2022 |
Role | Preliminary Road Design |
Services
Preliminary design of roads and platforms |
WTG logistics feasibility study |
Technical assistance for the organization of the project |
Platform, layout and land lease optimizations |
Review of Roads and Platforms conditions and identify improvements |
Challenges
Different costs and solutions for roads and hardstands required
Vallée de l’Aa Wind Farm
Location | Pas de Calais, France | |
Developer | ERG Renew | |
WTG Details | 4 * Vestas V112 | |
Capacity / COD | 14 MW | |
Role | Project Management/ Engineering / Supervision |
Services
Geotechnical Site Investigations (SI) Execution |
Civil/Structural IFT and IFC Design Packages |
Electrical IFT Design Package |
Theparak 1,4 WFs (OE-C) – Thailand
Location | Nakhon Ratchasima, Thailand |
Developer | Wind Energy Holdings |
WTG Details | 60*V136 (Vestas) WTGs, 157m HH |
Capacity / COD | 180 MW |
Role | Contractor’s Engineer |
Services
Foundation Design |
Foundation Construction Supervision |
Method Statement and Quality Documentation implementation |
Challenges
Size and structure of the project, Language, Culture, Standards |
Drafting & obtaining approval from DNV of Quality Management Plan |
Simultaneous to construction works monitoring |
BVDR WFs (OE-D) – NL (36-41)
Location | Noord Holland, The Netherlands | |
Developer | Eurus Energy Europe (EEE) | |
WTG Details | 13 x Vestas V90 2.0 / 2 * Enercon E70 | |
Capacity / COD | 33 MW | |
Role | Technical Due Diligence |
Services
Technical Due Diligence |
Challenges
Evaluation of cracks and gaps in concrete in operational Wind Turbines |
Gaps in Quality Control Documents provided by Contractor |
Determining level of severity of damages in order to make warranty claim |
Dealing with issues related to Contractor’s Quality Management System |