Design Reviews & Root Cause Analysis

  • Initial analysis to identify probable cause (design/construction)
  • Executive Designs Review
  • As-Built Documentation Review
  • Construction Quality Documentation review
  • Test Results Analysis
  • Non-Conformance and Defects Review
  • Asset Management reporting review
  • Maintenance Program Review
Forte Value: Our process combines detailed desk study and on-site review to ensure accuracy and completeness of the assessment.  

Condition Assessments

  • Site Inspections
  • Civil and Structural Specialist Inspections
  • Electrical Specialist Inspections
  • Mechanical Specialist Inspections
  • Design Review
  • As-Built Documentation Review
  • Non-Conformance Review
  • Test Results Analysis
  • Maintenance Program Review
  • Design life impact assessment
  • Repair and Maintenance Consultancy (Method + Cost)

Forte Value: Our process combines detailed desk study and on-site review to ensure accuracy and completeness of the assessment.

Track Record

Case Studies

Ventelys WFs (DES-A) - France

Location Various locations, France
Developer Ventelys
WTG Details V126, V150, SG114, SG170
Capacity / COD 234 MW, 2022
Role Preliminary Road Design

Services

Preliminary design of roads and platforms
WTG logistics feasibility study
Technical assistance for the organization of the project
Platform, layout and land lease optimizations
Review of Roads and Platforms conditions and identify improvements

Challenges

Different costs and solutions for roads and hardstands required

ventel-siemens-logo

Vallée de l’Aa Wind Farm

Location Pas de Calais, France
Developer ERG Renew
WTG Details 4 * Vestas V112
Capacity / COD 14 MW
Role Project Management/ Engineering / Supervision

Services

Geotechnical Site Investigations (SI) Execution
Civil/Structural IFT and IFC Design Packages
Electrical IFT Design Package

Theparak 1,4 WFs (OE-C) – Thailand

LocationNakhon Ratchasima, Thailand
DeveloperWind Energy Holdings
WTG Details60*V136 (Vestas) WTGs, 157m HH
Capacity / COD180 MW
RoleContractor’s Engineer

Services

Foundation Design
Foundation Construction Supervision
Method Statement and Quality Documentation implementation

Challenges

Size and structure of the project, Language, Culture, Standards
Drafting & obtaining approval from DNV of Quality Management Plan
Simultaneous to construction works monitoring
wind-energy-holding-logo

BVDR WFs (OE-D) – NL (36-41)

Location

Noord Holland, The Netherlands

Developer

Eurus Energy Europe (EEE)

WTG Details

13 x Vestas V90 2.0 / 2 * Enercon E70

Capacity / COD

33 MW

RoleTechnical Due Diligence

Services

Technical Due Diligence

Challenges

Evaluation of cracks and gaps in concrete in operational Wind Turbines
Gaps in Quality Control Documents provided by Contractor
Determining level of severity of damages in order to make warranty claim
Dealing with issues related to Contractor’s Quality Management System